|

MDOT Opens Part of Beach Boulevard in Bay St. Louis
GCN 7/3/09
The Mississippi Department of Transportation (MDOT) opened a portion
of Beach Boulevard in Bay St. Louis Thursday, July 2. This was the first
phase construction that begins at Ballentine Street and continued to
the CSX railroad.
The project, which includes roadway reconstruction and utility
installation, was awarded to Hemphill Construction Company, Inc. of
Florence, Mississippi for $5.97 million. Work on the 1.2 mile stretch of
roadway at Ballentine Street, continuing toward U.S. Highway 90 started
last year.
URS Corporation of Jackson, Mississippi provided construction engineering
and inspection on behalf of MDOT.
Phase two construction will begin next week, starting from the CSX
railroad continuing northeast to U.S. Highway 90. Access will
be restricted to local traffic only during the next phase of traffic.
Beach Boulevard was heavily damaged by Hurricane
Katrina in 2005. Since that time the roadway has been open with a
temporary limestone surfacing treatment while the city has worked to do
local utility and road work. The project is scheduled for completion in
January of 2010.
 |